Nepal Electricity Authority Logo Transmission Directorate
Nepal Electricity Authority Logo
जेष्ठ १०, २०८३, आईतवार Sunday, 24th May 2026 Transmission Directorate
Maintenance Shutdown Schedule

Maintenance Schedule

Close

Annual Reports

April 03, 2026 Annual Reports
NEA DCSD Magazine 2082

NEA DCSD Maganize 2082

View More
  • Birauta Substation (IEE Report)

    2026-05-22 News
  • Balaju- Singhadurbar (K3) 132 kV Underground Transmission Line (IEE Report)

    2026-05-20 News
  • Vidyut 2082

    2026-04-03 Annual Reports
  • NEA DCSD Magazine 2082

    2026-04-03 Annual Reports
  • Transmission Directorate 2082

    2026-04-03 Annual Reports
  • Generation Directorate 2081/82

    2026-04-03 Annual Reports
Accessibility Options